Advertisement

Timeline

Y/M/D Person Association Description Composition Food Event
Y/M/D Person Association Description Composition Food Event
1952/00/00 Hugh MacRae Morton Developer One of Hugh MacRae Morton's first projects at Grandfather Mountain is a $15,000 suspension bridge to be erected between Convention Table Rock and Linville Peak.
1952/09/02 Charles C Hartmann Jr Architect High Swinging Bridge opens at Grandfather Mountain. The structure was fabricated in Greensboro by the Truitt Manufacturing Company and installed over a three weeks on Grandfather Mountain by the Craven Steel Erecting Company.
2000/00/00 After a routine inspection in the late 1990s, the Mile High Swinging Bridge is rebuild at a cost $300,000. The new structure is custom-welded on site using the original I beams.

Data »

Particulars for Mile High Swinging Bridge:
Criteria Architecture-Engineering
Structure type Bridge
Area of Significance Engineering
Historic Use Pedestrian Related
Sight Category Structure
Bridge Type Suspension Bridge




Shopping on Amazon

As an Amazon Associate I earn from qualifying purchases.

Google Ad

Google Ad
?